Tiling to cement: sand render walls
PREPARATION The render must be a minimum of 2 weeks old to enable movement caused by drying shrinkage to have taken place. It must be clean, dry and free from dust, laitance or any other contaminants which may act as a release agent, preventing the adhesive from bonding to the render. If the render is […]
How To
Tiling to plasterboard walls
PREPARATION Plasterboard should be dry, securely fixed and rigid with no protruding fixings with the face to receive decorative finishes exposed. It should be a minimum 12.5mm thick when fixed to timber framing or battening and fixed in accordance with the manufacturers recommendations. The maximum weight of tiling which plasterboard is able to support is […]