User Type: Fixers

Stafford Leisure Centre

Norcros products were used in the complete refurbishment of Stafford Leisure Centre. The new state-of-the-art leisure facilities include a 25 metre swimming pool, a teaching pool with movable floor, a pool hall and surroundings, as well as full changing, gym and beauty facilities.

The products used included;

All of the products used were highly polymer modified, ensuring that they would be capable of lasting in such a demanding environment.

Houses Of Parliament

Refurbishment of Press Office Cafeteria

The challenge was to provide fixing systems that would enable tiles to be fixed to three different substrates including; concrete, existing floor tiles and woodblock flooring.

Norcros Rapid Porcelain Grey Adhesive was used on the solid concrete floors and also on top of the existing floor tiles once a slurry-bonding coat, consisting of 2 parts adhesive mixed with 1 part Norcros Prime Bond, had been brush applied onto the tiles to provide a key.

By using Norcros 2-Part Tile Direct to Wood Rapid elastomeric adhesive, it was possible to fix tiles securely over the woodblock flooring once the floor had been prepared.

In all areas, Norcros Super Epoxy Grout was used to provide a hygienic, easy clean surface.

First Leisure – St Neots

A stunning redevelopment of Huntingdon District Council’s One Leisure Sports Facility in St.Neots, Cambridgeshire. Centred around construction and installation of the new ‘Pure Health & Well Being’ facility, Elite Tiling have completed a very high specification wall & floor tiling package to changing rooms, showers, WCs and throughout the new ‘Pure’ facility.

Tiling works included four therapy rooms and four specialist heat experience rooms including link corridors, male & female changing rooms & showers and childrens creche. The new ‘Pure Health & Well-Being’ facility, is finished with a beautiful collection of ceramics & glass wall tiles and glass mosaics, including snail shower, sauna rooms and the feature centre piece ‘Pure’ logo mosaic floor.

The products used included;

Main Contractor: R G Carter Peterborough
Architect: BSD
Project Completed: September 2010