First Leisure – St Neots

A stunning redevelopment of Huntingdon District Council’s One Leisure Sports Facility in St.Neots, Cambridgeshire. Centred around construction and installation of the new ‘Pure Health & Well Being’ facility, Elite Tiling have completed a very high specification wall & floor tiling package to changing rooms, showers, WCs and throughout the new ‘Pure’ facility.

Tiling works included four therapy rooms and four specialist heat experience rooms including link corridors, male & female changing rooms & showers and childrens creche. The new ‘Pure Health & Well-Being’ facility, is finished with a beautiful collection of ceramics & glass wall tiles and glass mosaics, including snail shower, sauna rooms and the feature centre piece ‘Pure’ logo mosaic floor.

The products used included;

Main Contractor: R G Carter Peterborough
Architect: BSD
Project Completed: September 2010

Other Case Studies

Case Studies

Beckworth Emporium, Northampton

Beckworth Emporium is a garden centre with a food hall specialising in local produce, located in Northampton. This year saw the opening of their brand-new restaurant; ‘The Restaurant in the Glasshouse’. Aiming to bring an all-new restaurant experience, you can enjoy a relaxed dining atmosphere in the natural light of the glass conservatory space.   […]

Case Studies

Moss Bros

For their flagship Moss store at Canary Wharf there was no one better ‘suited’ to the job than Johnson Tiles and Norcros Adhesives.

Technical Support

For technical information about Norcros Adhesive products please call:

01782 524140

Technical Support

Technical Support

For technical information about Norcros Adhesive products please call: 01782 524140

tick

CPD videos

View videosContinuous professional development videos