Floor Levelling Over Bitumen or Old Adhesive Residues

Step by Step Guide to Levelling a Floor Using Pro AF Levelling Compound

Before you start

  • Ensure the surface is sound, dry (<75% RH) and free from contaminants
  • Concrete and sand:cement screeds must be fully cured and any laitance or surface treatments removed

Mixing

  • Pour the contents of the container into a clean mixing bucket
  • Add the contents of the bag to the bucket and mix until a smooth, lump-free consistency is achieved

Laying

  • Pour the compound onto the floor and trowel out to the desired depth (it is also suitable for pump application with the appropriate equipment)
  • Lay ceramic or porcelain tiles after 3 hours, or floorcoverings after 4 hours

Other How To's

How To

How to Grout Mosaic Tiles

How to Grout Mosaic Tiles We collaborated with House of Mosaics to create this simple step by step informative guide to grouting mosaic tiles. What is Grout? Grout is a type of mortar that fills in the gaps between tiles. This prevents moisture and dirt from getting between and behind the tiles. Grout also gives your entire […]

How To

Resilient Flooring to Anhydrite Screeds Incorporating Underfloor Heating

Description Sometimes referred to as a calcium sulphate, gypsum-based or flow screed, anhydrite screeds are a mix of fine and coarse aggregates, with a calcium sulphate (gypsum) or calcium sulphate dehydrate binder which are designed to provide a level surface ready to receive a resilient or engineered wood finish. They have a fluid consistency and […]

Technical Support

For technical information about Norcros Adhesive products please call:

01782 524140

Technical Support

Technical Support

For technical information about Norcros Adhesive products please call: 01782 524140

tick

CPD videos

View videosContinuous professional development videos