How To Level A Floor Using Pro 30 Fast Track Eco Levelling Compound

  1. First, make sure the area is clean and dry. Brush away any dust, dirt, or laitance
  2. Now you’re ready to prime. Thoroughly mix Norcros Prime Bond with water at a ratio of 1-to-4
  3. Apply with a brush over the floor and leave to dry
  4. Now you’re ready to start applying the leveller. Add 5 litres of water to a clean bucket and slowly add the 20kg bag
  5. Using a drill mixer, mix enough leveller for about 20 minutes working time
  6. Mix it to a smooth consistency
  7. Pour the compound onto the floor
  8. Trowel out to the desired depth, ensuring all areas are evenly covered
  9. Test if the levelling compound is dry by using your hand. It’s normal for heat to radiate from the newly-laid floor
  10. Once it’s dry, floor coverings can be laid using the manufacturers recommended methods

Other How To's

How To

How to Grout Mosaic Tiles

How to Grout Mosaic Tiles We collaborated with House of Mosaics to create this simple step by step informative guide to grouting mosaic tiles. What is Grout? Grout is a type of mortar that fills in the gaps between tiles. This prevents moisture and dirt from getting between and behind the tiles. Grout also gives your entire […]

How To

Resilient Flooring to Anhydrite Screeds Incorporating Underfloor Heating

Description Sometimes referred to as a calcium sulphate, gypsum-based or flow screed, anhydrite screeds are a mix of fine and coarse aggregates, with a calcium sulphate (gypsum) or calcium sulphate dehydrate binder which are designed to provide a level surface ready to receive a resilient or engineered wood finish. They have a fluid consistency and […]

Technical Support

For technical information about Norcros Adhesive products please call:

01782 524140

Technical Support

Technical Support

For technical information about Norcros Adhesive products please call: 01782 524140

tick

CPD videos

View videosContinuous professional development videos